Guide contents
What should you charge for a project? The amount becomes easier to build when you know what it must cover and what the client is buying. Start with scope, estimate the actual work and compare the proposal with costs, capacity and the client’s need.
This guide offers a preparation method and a fictional calculation you can check by hand. It also helps price a first project when records are limited. No figure is a recommended rate for everybody; the tax references concern France.
- The result, boundaries and work assumptions.
- Production, management, review time and expenses.
- Project capacity and the business’s economic basis.
- The offer’s value, options and agreed conditions.
Price a result and the assumptions that make it possible.
A price starts with what you commit to provide. Describe the result, deliverables, formats and boundaries. Add what the client needs to supply: content, access, resources or decisions. You can then estimate an identifiable service and explain what would change the proposal.
Break down the work before choosing an amount
List the stages needed to reach the result: scoping, collection, production, discussions, review and handoff. For a sales presentation, that could include reading content, defining a structure, designing slides and making agreed adjustments. The tools used do not, on their own, tell you how much work will be required.
Ask about reference material, the expected finish and who will examine the result. A date tied to an event can affect organisation. Check those points before turning an initial estimate into a commitment on price and timing.
Make unknowns visible
Record assumptions affecting the estimate, such as usable client copy, number of versions, no travel or availability of the client contact. If a point blocks estimation, clarify it or propose a separate scoping stage. A named assumption is easier to discuss than a cost discovered during production.
Estimate production, coordination and review.
Allow for production time, then the time needed to move this project forward: preparing discussions, coordination, checks, feedback and handoff. On a fixed-price project, those hours are not necessarily invoiced as separate lines, but they use capacity and need to be included in your estimate.
Separate project work from general business administration
A meeting specific to the client belongs to project time. Prospecting, general training or running your business belongs to another part of the calendar. Keep that distinction so you do not omit project coordination or count it twice when assessing available capacity.
You can estimate a range when tasks remain uncertain. Explain what separates straightforward execution from a more difficult case. Records of comparable tasks and a limited internal trial provide better references than choosing a number simply to fit the requested budget.
Then choose a suitable pricing model
Internal time estimates also matter when you sell an overall result. To decide how to present the commercial commitment, compare fixed price and daily rate according to how clearly the project is defined. Here, the method stays focused on building and checking the amount rather than repeating that comparison.
Connect costs, business needs and capacity available to sell.
Not every available hour can be allocated to sold projects. Allow for prospecting, general administration, learning and periods without orders. An internal hourly basis needs to be considered alongside realistic project capacity and what the business must fund over the same period.
Prepare an amount consistent with your circumstances
Bring together operating expenses, remuneration needs and estimated contributions or other relevant levies for your status. Direct and indirect costs need examination. Public tools and appropriate support can help construct assumptions; turnover, business result and personal income are not interchangeable. Choose a tool matching your status: Urssaf’s “indépendant” simulator excludes micro-entrepreneurs, who have a separate tool.
Dividing a chosen annual amount by project capacity gives an indicative coverage basis. That budget is not automatically the accounting cost of an hour. The actual calculation needs to consider status, business volume and costs varying with sales, then be reviewed when those assumptions change.
Account for purchases and fees once
Identify project-specific expenses not already in the annual amount, such as a supplier, licence, travel or another purchase. Explain what is included, separate or paid directly by the client. Also check payment and platform fees for your plan and chosen process, without assuming the same price applies to everybody.
For the French tax references, adapt amounts to your VAT position and obligations. VAT collected is not money freely available to pay yourself; unrecoverable purchase VAT needs to be included in the cost borne by the business.
Reproduce a fictional fixed-price proposal calculation.
Consider a fictional redesign of a sales presentation. Assume an annual amount of €48,000 to fund, already constructed around business needs, remuneration and relevant estimated levies. It is not net income. The project-specific direct expenses of €100 are not already included in that amount.
Move from assumptions to a proposed price
The freelancer plans 1,600 working hours in the year, including 640 unavailable for allocation to projects. That leaves 960 hours of capacity to sell, including project-specific coordination. The internal basis is therefore €50/hour. Prices and purchases in this example exclude VAT, with purchase VAT assumed recoverable and treated separately.
| Item | Calculation used | Result |
|---|---|---|
| Annual project capacity | 1,600 h − 640 h | 960 h |
| Internal coverage basis | €48,000 ÷ 960 h | €50/h |
| Production | 18 h × €50/h | €900 |
| Project-specific management | 4 h × €50/h | €200 |
| Planned review and adjustments | 4 h × €50/h | €200 |
| Explicit time allowance | 4 h × €50/h | €200 |
| Direct expenses outside the annual amount | Assumption specific to this project | €100 |
| Indicative project basis | 900 + 200 + 200 + 200 + 100 | €1,600 |
| Chosen commercial addition | Fictional amount added to the basis | €300 |
| Proposed price | 1,600 + 300 | €1,900 excluding VAT |
You can check the total with one formula: (18 + 4 + 4 + 4) × (48,000 ÷ (1,600 − 640)) + 100 + 300 = 1,900. Project management hours are not included in the 640 general hours removed; the four-hour allowance is added only once.
Understand what the lines mean
The allowance covers estimated uncertainty about the condition of supplied files. It does not replace the four planned review hours or expand the deliverables. No second contingency percentage is added. The €300 is a fictional commercial pricing choice, rather than guaranteed net margin or a market rate.
The €50/hour and €1,600 remain references derived from chosen assumptions. Replace the annual amount, capacity, time and expenses with your own data. You still need to check the offer’s actual economic consistency. None of the amounts in the example is a universal recommendation.
Compare the basis with value, market context and options.
The coverage calculation informs the decision without determining alone what a client will accept. Also consider how the result will be used, responsibilities taken, your ability to deliver and genuinely comparable alternatives. Deliverables, support, conditions and uncertainty change the comparison between two offers.
Study comparable services
Look at what an observed price includes and its context. A public amount may concern a minimal option, temporary promotion or another client type. Use conversations and responses to proposals to refine positioning, without turning an isolated figure into a required rate.
Value to the client can justify a proposal different from a simple conversion of time. Explain that value through the work provided and realistic expectations. Avoid promising sales, leads or gains you cannot guarantee.
Adjust content when the budget differs
Offer a smaller scope, priority or separate phase where it addresses the need. Describe what is removed or changes, including dates and review. A discount remains a possible commercial decision; it is neither compulsory when starting out nor an automatic way to make a project viable.
Price a first project by reducing unknowns.
When you lack records, start by breaking down a small project and identifying questions that could change its duration. Ask about existing content, access, the decision-maker, expected standard and relevant deadlines. You build an estimate you can explain and improve using the actual project outcome.
Try a task and plan useful scoping
A limited internal trial on representative material can help estimate part of the work. Record time, difficulties and trial conditions. That experience does not necessarily cover client discussions, organisation or other deliverables. Add those tasks rather than mechanically multiplying a production speed.
If the need is too open, propose a scoping phase with an objective, result, date and price. It can define a possible next phase that remains to be decided. If scoping is already included in the project, keep it in the calculation only once.
Keep the first offer bounded
A pilot project can provide a smaller result useful to the client. Define its limits and what will be reviewed before any further engagement. It should not imply that a full project fits a reduced budget, or impose a discount or public reference as a starting condition.
Explain scope and what you can estimate honestly. You do not need to invent past results to support the price. Careful preparation, a readable proposal and a review point already give the client references and provide useful data for your next estimates.
Send a proposal connecting price with the agreed process.
Present the amount alongside deliverables, exclusions, client contributions and dates that give it meaning. You do not need to expose your entire internal budget, but the client should identify the service and options. Clarify how a change will be handled before it becomes additional work.
Name fees and important conditions
Distinguish project price, external purchases and fees that need separate explanation. Check taxes and information needed for invoicing. Confirm the starting condition and how the schedule will be reviewed if a contribution is missing. Those decisions make the amount easier to understand.
Explain Dealokr’s fixed-price process
In Dealokr, agreed scope and price accompany the signed terms. For fixed-price work, the client pays 100% before production through Stripe Connect, then views a preview and can request the agreed revisions. You request the transfer under the project’s conditions; confirmation opens access to hosted final files. The bank payout is separate.
Full payment at the start does not turn the price into available profit. The business still needs to fund work, expenses and applicable levies. Check your plan’s fees and the actual payment status before announcing a step to the client.
Compare estimated and actual figures for the next proposal.
At the end, compare actual time and expenses with original assumptions. Separate production, coordination, review and accepted changes. You can see whether a difference came from an underestimate, missing contribution, incident or added work. That reading helps improve the next proposal rather than treating every overrun as the same problem.
Review a first project usefully
Record stages you forgot and questions that could have avoided uncertainty. Also look at what worked: usable content, an available contact or organised review. Those observations let you adapt scope, contingency and organisation instead of raising or reducing every price without understanding the cause.
Update business assumptions
Review capacity available to sell and the annual amount when your pace, costs or status change. Track accepted prices and profitability with tools suited to your circumstances. In Dealokr, terms and project stages provide a reference for reviewing what was agreed; your economic assessment still needs your actual data.
Useful pricing connects a result, assumptions and a commercial decision. Prepare costs and time, keep an explicit allowance and check what the amount actually means for your business. After the project, compare estimated and actual figures: that is how the method becomes more reliable for future proposals.
- Bpifrance Création — Setting prices when starting a business
- Bpifrance Création — Cost price
- Bpifrance Création — Break-even point
- Urssaf Mon-entreprise — Self-employed income simulator and its limitations
- Entreprendre Service Public — Prices excluding and including VAT
- Dealokr — Scope, price, fixed-price payment and hosted final-file handoff
- DGFiP — VAT collected and deduction on purchases
This method helps prepare a price from your assumptions. The example is entirely fictional and calculates neither net income nor guaranteed profitability. Contribution and VAT references concern France and need adaptation to your status and circumstances.
Practical guidance for clearer freelance projects and payments.
